Project

Prisma Health Richland
Heart Hospital

Project Location

Columbia, SC

Industries

Clinical Services, Healthcare, Heart Centers

Services

General Contracting, Preconstruction

Square Footage

147,752 (Heart Hospital), 270,460 (Parking Deck), 4,820 (Welcome Center), 90,000 (Medical Office Building) and 5,250 (Central Energy Plant)

Schedule Duration

24 months total

Awards

  • 2006 ABC of the Carolinas Excellence in Construction Award

Prisma Health Richland Heart Hospital

Scope

  • Campus expansion and upgrade with two-story, steel-frame Heart Hospital encompassing 124 beds and 16 recovery beds, along with Cardiovascular Surgery, Cath Labs, Cardiovascular ICU Unit, Coronary Care Unit, Cardiac Diagnostics and Surgical Cardiology Inpatient Units

  • Hospital built on top of a four-story, cast-in-place, post-tension concrete parking deck with 741 parking spaces

  • New $4.6 million Central Energy Plant with new chillers, generators, boilers and electrical switch gear

  • New Welcome Center/Atrium that links the activities of the new Heart Hospital, Parking Deck and Medical Office Building through a very open and inviting glass-enclosed space

  • Four-level, steel-frame Medical Office Building with precast and curtain wall veneer materials. Contains space for a Cath Lab and MRI on first level

Highlights

  • In addition to the construction of the building shell and core space areas, the project required up fitting of approximately 75 percent of the building

Contact us to learn more about this project