Project
Wells Fargo
Levine Center for the Arts
Project Location
Charlotte, NC
Industries
Concrete Scope, Concrete Services
Services
Square Footage
123,000
Schedule Duration
34 months
Awards
2010 ABC of the Carolinas Excellence in Construction, Merit Award
Wells Fargo Levine Center for the Arts
Scope
Concrete services for The Knight Theater, Bechtler Museum of Modern Art, and the Wells Fargo Auditorium, three buildings that share a footprint and common infrastructure
The three-level Knight Theater: Six-story fly gallery area, constructed using cast-in-place concrete walls, columns and shear-walls with a steel roof truss and joist system. Exterior façade of brick veneer, glass curtain-wall at the main entrance, and corrugated and composite metal panel systems
The Bechtler: Structural steel with pan concrete floors and a terra cotta clad exterior with glass curtain-wall
The Wells Fargo Auditorium is on one of two lower levels of the Knight Theater, along with a pre-function space and access to two underground tunnels that lead to below-grade parking structures