Square Feet > 210,000 or greater
Alamance Regional Medical Center
Replacement Hospital
In November 1991, Rodgers was awarded a managing contractor agreement to assist in the development of a new $51.5 million replacement hospital on an 80-acre campus, consolidating the old Alamance County Hospital and Memorial...
Ballantyne Village
Retail and Office
Phase I project scope includes the construction of three new structures that integrate retail, parking, and offices spaces. The mixed-use development is situated on the last remaining undeveloped corner of Ballantyne Square in...
Bank of America
7th Street Station Parking Deck
In April 1997, Rodgers was selected by Bank of America to provide construction services for a 10-level, 543,000 square foot cast-in-place, concrete parking deck on one block between Sixth and Seventh Street in highly-trafficked...
Bechtler Museum of Modern Art
Levine Center for the Arts
Located in the new Cultural Arts District of downtown Charlotte, The Bechtler Museum will house the Andreas Bechtler family’s private collection of modern art - including several important artists, such as Tinguely, Niki de Saint...
Belk Stores
Belk – SouthPark Mall
In April 2001, Rodgers was awarded a preconstruction and general construction contract to expand and renovate Belk Stores retail department store at SouthPark Mall in Charlotte, North Carolina. The 18-month project transformed...
Belk Stores
Belk – Carolina Place Mall
Located in Pineville, North Carolina, the Belk at Carolina Place Mall represents the fourth Belk store project that Rodgers has completed since the mid-1980s. Other Belk store projects include Eastland Mall, Charlotte, North...
Belle Meade Retirement Resort
Continuing Care Retirement Community
The project scope encompassed all sitework including clearing, road construction, utilities, lakes and landscaping; construction of 48 cottage units, with a mix of single and duplex; three 84,000 square foot, 3-story,...
Billy Graham Evangelistic Association
The Billy Graham Library and Museum
The project scope includes the preconstruction and construction of a single-story, steel-frame library/museum that is dedicated to the life and teachings of Reverend Billy Graham. The 40,000-square-foot facility, which resembles...
Carolinas Medical Center – Mint Hill
Medical Office Building
The project scope includes the preconstruction and construction of a 3-level, steel frame Medical Office Building for Carolinas Medical Center in Mint Hill, North Carolina. The 60,000 square foot facility incorporates a precast...
Carolinas Medical Center – NorthEast
Building Expansion & Children's Hospital
The project scope includes a 2-level vertical expansion over the existing clinical services building constructed by Rodgers in 1997/1998. The 96,000 square footage, steel frame addition includes a new ICU/Patient Care bed unit...
Carolinas Medical Center – NorthEast
Clinical Services Building
Rodgers provided comprehensive preconstruction and construction services for the development of a 270,000-square-foot clinical services building at this growing medical center. The project included an emergency department, new...
Carolinas Medical Center – NorthEast
Parking Deck
The Parking Deck scope involves the construction of a 4-level, 967-space structure. The pre-cast deck is approximately 318,000 square feet and includes a pre-cast panel exterior skin with brick inlay.
Carolinas Medical Center – Union
Medical Office Building
The project scope included preconstruction and construction of a 3-level, steel-frame medical office building on the campus of Carolinas Medical Center Union. The 60,000 square-foot facility is adjacent and connected to the...
Cassidy Turley
Office Upfit
Rodgers completed Cassidy Turley’s new office, located on the 34th floor of the Duke Energy Center building, within two months. The first generation upfit included a new reception area, conference rooms, café, server room,...
Central Church of God
Children's Church
Project scope included the construction of a new, stand-alone Children's Church facility on the existing campus of the Central Church of God. The 1.5- level, steel-frame structure contains approximately 22,000 square feet of...
Central Piedmont Community College
Philip L. Van Every Culinary Arts Center
Over the course of 14 months, Rodgers worked steadfast to complete Central Piedmont Community College’s (CPCC) new culinary arts building—just before students returned for the 2009 fall semester. The 30,612-square-foot building,...
Charlotte Country Club
Clubhouse Restoration and Addition
Charlotte Country Club hired Rodgers to execute a comprehensive renovation and restoration of their Clubhouse, which dates back to 1931, and to build a new two-level, 9,600-square-foot addition. Every room in the Clubhouse was...
Charlotte Mecklenburg Schools
Mallard Creek High School
Project scope includes the construction of a new high school consisting of one main building and multiple field buildings situated on 62-acres in northeast Charlotte. Site plans include a courtyard, auditorium, cafeteria,...
Charlotte Mecklenburg Schools
William A. Hough High School
The new 258,000-square-foot high school is situated on 60 acres of land in Cornelius, North Carolina. The main building is a two-story, steel structure with masonry skin. Inside there are 99 classrooms, which includes 16 science...
Chatham Hospital
Replacement Hospital
The project scope includes a new 25-bed critical access hospital. This 72,000 square-foot steel-frame hospital replaces the former 55-year-old facility nearby in Siler City. The new hospital includes the following services:...
Christ Covenant
Sanctuary
The new sanctuary seats 2,200 people and includes a balcony that allows seating for an additional 1,000 people. The 44,000-square-foot facility includes a music ministries choir rehearsal area, adult and preschool classrooms,...
City of Mauldin
Sports & Recreation Center
The project scope involves the preconstruction and construction of a 30,000 square-foot sports and recreation center for the City of Mauldin. The project delivery method follows the CM-at-Risk approach. The facility includes a...
Cleveland Regional Medical Center
Emergency Department & Outpatient Center
The project includes a 2-level addition of 48,000 square feet and renovation of 10,000 square feet. The new construction houses a comprehensive emergency department, PACU, pre/post op, lab, support space, physicians' lounge,...
Covenant Day School
High School
Project scope for Covenant Day School (High School) includes space for approximately 300 students. Phase I includes a new, two-story, 48,000 square foot structure built adjacent to the existing Christ Covenant Church campus. It...
Crate & Barrel
Homestore – The Streets of Southpoint
The Crate & Barrel building is a steel structure with concrete slab-on-grade and decking. The one-story retail store has showroom space, back-house space for storage/stocking, and a loading dock. The three exterior facades are a...
Daniel Stowe Botanical Garden
Visitor Pavilion & Phase I Gardens
The project consists of a multi-phased, 450-acre botanical garden in Belmont, North Carolina. Phase I of the five-phased, 20-year project includes the development of approximately 106 acres. Phase I was completed in Fall 1999,...
Daniel Stowe Botanical Garden
Orchid Conservatory
Phase II of the Daniel Stowe Botanical Garden (DSBG) development consists of a new Orchid Conservatory. This is Rodgers' second project for DSBG and it is part of a five-phase, 20-year development plan to develop the regional...
Davidson College
Watson Life Sciences Building
The project consists of a new 3-level, 50,000 square foot life sciences building on the campus of Davidson College. The floor plan includes mainly classroom space, research laboratories, office and other support space. The...
Davidson College
Duke Residence Hall
Project scope consisted of a 23,000 square-foot, 4-story addition to the Duke Dormitory. The new structure is composed of a masonry veneer and hollowcore floor slabs. There was an additional 14,000 square feet of comprehensive...
Davidson College
Cunningham Fine Arts Building Renovation
Cunningham Fine Arts Building was originally built in 1961. The building’s brick exterior remained intact, but the 24,000-square-foot interior space was renovated and upgraded to accommodate new theatrical equipment and the...
Davidson College
Chambers Building Comprehensive Renovation
Originally constructed in 1927, the 95,000-square-foot Chambers Building is the most prominent academic building on the Davidson College campus. The project scope focused on a comprehensive renovation of the Chambers Building...
Davidson College
Davis Residence Hall
Beginning in 2011, a new residence hall became available to Davidson College students. Rodgers was responsible for the construction of Davis Residence Hall, the seventh building in Martin Court, an area of campus that is...
Deerfield Episcopal Retirement Community
Expansion and Renovation Program
Deerfield Episcopal Retirement Community is located on 125 acres of land in Asheville, North Carolina. As part of a campus expansion, Rodgers Builders constructed three new buildings that included separate additions, tie-ins, and...
Elon College
McMichael Science Building
The four-level, 82,000 square-foot McMichael Science Center at Elon University in Elon, North Carolina includes new laboratories, research/ monitoring facilities, classrooms, offices and support spaces for the Biology, Chemistry...
First Presbyterian Church
Education Addition Phases I & II
In 1999, Rodgers was selected to perform preconstruction and construction services for the new fellowship, education, kitchen, and sanctuary expansion and renovation. This $10 million expansion includes over 75,000 square feet of...
Forsyth Medical Center
Parking Deck & Central Energy Plant
The North Parking Deck scope includes the construction of a 4-level, cast-in-place concrete parking deck situated directly adjacent to the new North Pavilion Addition. The 558,700 square foot deck accommodates spaces for 1,416...
Forsyth Medical Center
North Pavilion
The project scope includes three main components on the campus of Forsyth Medical Center. The North Pavilion involves a new 9-level, Women's Center addition adjacent and connected to the existing main hospital complex. The...
Foundation For The Carolinas
Corporate Headquarters
The project scope included the complete demolition and upfit of the former Kale Lawing office building located at 217 South Tryon Street in Charlotte. The new facility was constructed for Foundation for the Carolinas, a...
Greenville Memorial Hospital
Diagnostic & Treatment Pavilion
This project was an addition to the existing hospital; it consisted of five floors of shell space along with a complete interior upfit and a renovation to the existing lab. The new structure was constructed over the existing...
Greenwood School District 50
Oakland Elementary School
Over the course of 14 months, the Oakland Elementary School addition and renovation project was divided into phases to ease the transition while classes remained in session throughout construction. The 15,000-square-foot...
Hamilton Medical Center
Emergency Department
The project scope includes an expansion and renovation to Hamilton Medical Center's Emergency Department. The addition involves an underground basement level of 1,000 square feet and a 6,730 square-foot above-ground, steel frame...
High Point Regional Hospital
Expansion and Renovation Program
The expansion and renovation program included a $3.6 million, 18,000 square foot second-level vertical expansion to the existing single level Surgery Center, a new $23.2 million, 135,000 square-foot, 5-level Cardiology Pavilion,...
Knight Theater
Levine Center for the Arts
This 1,150-seat multi-purpose theater is located in a newly developed cultural arts district of downtown Charlotte, North Carolina. This city-owned theater is designed for local art groups such as dance companies, city youth...
Lance, Inc.
Corporate Office
The transformation of Lance Inc.’s 1950s warehouse/support building into a Class-A corporate office space took place over the course of 15 weeks. Rodgers demolished the entire interior of the two-story brick structure and...
Latta Pavilion
Residential, Retail and Office
Latta Pavilion, located on East Boulevard at Kenilworth Avenue, incorporates street-level shops, office space, restaurants, apartments, and condominiums. The development consists of two buildings totaling over 500,000 square...
Maersk
Arrowood Regional Operations Center
The project scope for Maersk, Inc.'s new Arrowpoint Regional Operations Center includes preconstruction services and comprehensive office renovations. The 350,000 square-foot, renovated space will house Maersk's 7,000...
McColl Center for Visual Art
Gallery & Artists Studios
In Spring 1998, Bank of America selected Rodgers to begin restoration and renovation of the former First Associate Reformed Presbyterian Church located on North Tryon Street in downtown Charlotte. The restored facility houses the...
Meredith College
Science and Mathematics Building
In August 2001, Rodgers began construction of Meredith College's new multidisciplinary facility for math and science teaching and research. The facility is a lab-rich environment including Biology, Chemistry, and Computer Science...
Montreat College
McGowan Center for Christian Studies
The project consists of a 212-seat sanctuary and support space for Christian studies and faculty offices. Located in the heart of the campus, the 8,000 square foot structure has an 85-foot steeple, a visible landmark from most...
Morrison Place
Residential and Retail
Phase I project scope includes the construction of two 2-level mixed-use buildings (B&E) situated in the prominent South Park area of Charlotte. The two buildings total 92,000 square feet and are steel-frame construction. The...
Nash General Hospital
Surgery Pavilion
The surgery pavilion consists of a 2-story, 66,000-square-foot addition connected to the existing hospital at five locations. It includes 8 operating rooms, 14 pre-op/post-op rooms, new PACU, sterile supply/decontamination...
North Carolina Dance Theatre
Theatre & Dance Studios
North Carolina Dance Theatre’s (NCDT) groundbreaking ceremony was held in April 2009 and Rodgers completed the building approximately one year later. This building has since been named the Patricia McBride and Jean-Pierre...
Oconee Medical Center
Patient Tower
The new 210,000-square-foot Patient Tower at Oconee Medical Center has six stories, mechanical penthouse, and a basement level. It has been designed to accommodate three additional floors, if needed in the future. Inside the...
Palmetto Health Richland
Heart & Vascular Hospital
Project scope includes a $80 million campus expansion and upgrade to the Palmetto Health Richland hospital campus. Project components include a 4-story, cast-inplace, post-tension concrete parking deck. The $10.4 million deck is...
Pennybyrn at Maryfield
Continuing Care Retirement Community
This project is an expansion of the existing Maryfield Retirement Community overlooking High Point City Lake. New construction consists of a three-story building with a Community Commons and Wellness Center, two contiguous wings...
Presbyterian Hospital
Women's Services Center
The Women's Center expansion and renovation program included a 66,000-square-foot vertical expansion atop an existing 8-story precast parking deck, a 20,000-square-foot North Wing addition above the existing 2-story Children's...
Presbyterian Hospital
Visitor Parking Deck B
The project scope included a new 7-level, 500,000 square foot pre-cast parking deck on the Presbyterian Hospital campus in Charlotte, North Carolina. The 1,500-space parking deck was designed and constructed to accommodate future...
Primax Properties
1065 East Morehead - Corporate Offices
The project scope involved the preconstruction and construction of a 4-level office building and parking deck on Morehead Street in Charlotte, North Carolina. The steel-frame office building is approximately 39,000 square feet...
Queens University of Charlotte
Wireman Residence Hall
The project consists of a five-story, 90,000 square-foot dormitory. The structure is cast-in-place, post-tension concrete with brick veneer, cast stone water table and GFRC cornices and entablatures. The facility includes a...
Queens University of Charlotte
Sykes Business Learning Center
Project scope consisted of a four-story, 29,000 square-foot addition to the University campus. The Learning Center is composed of a cast-in-place concrete frame basement with a three-level steel frame above. Included within the...
Roper Hospital
CyberKnife Addition & Linear Accelerator
This unique project marked the first CyberKnife in the State of South Carolina. Roper Hospital’s CyberKnife addition included renovating the existing x-ray department (1,600 square feet) to accommodate the CyberKnife unit and...
Self Regional Healthcare
Cancer Center Addition and Renovations
This project consisted of renovations (38,000 SF) and additions (9,800 SF) to convert and create space for Self Regional’s Cancer Center. The main lobby (4,200 SF) was also renovated during the same time period. Building...
Southminster Retirement Community
Expansion and Renovation Program
Rodgers was selected to provide comprehensive preconstruction and construction services for the $66 million expansion and renovation program at Southminster Retirement Community. The project scope included 283,000 square feet...
State of North Carolina
Western Data Center
The project scope includes 50,000 sq. ft. new data center that protects all State of North Carolina government data in the event of a natural disaster or threat to homeland security. The data center contains over 15,000 sq. ft....
The Forest at Duke
Continuing Care Retirement Community
In July 1990, Rodgers broke ground on the 50-acre site for the Forest at Duke, a full-service, continuing care retirement community in Durham, North Carolina. Rodgers negotiated with the Forest at Duke to provide comprehensive...
The Medical Center of Central Georgia
Heart and Vascular Hospital & Parking Deck
The project scope involved the construction of a 221,300-square-foot comprehensive Heart Hospital directly adjacent to the existing hospital. The steel-frame building has eight levels and connects to the existing hospital on five...
The Mint Museums
Mint Museum of Craft + Design
In February 1998, Rodgers began renovation and restoration of the former Montaldo's department store building located in downtown Charlotte. The 82,000 square-foot historic structure now houses the Mint Museum of Craft + Design....
The Pines at Davidson
Continuing Care Retirement Community
Built in three phases, Phase I included 171 units, 2- and 3-story buildings, 10 duplex cottages, 60-bed Healthcare Center (40 nursing beds, 20 skilled care beds), and a Community Center. Phase II consisted of a Healthcare Center...
The Presbyterian Homes at High Point
River Landing at Sandy Ridge
Sitework for the 60-acre community includes clearing, road construction, utilities, lakes and landscaping. Independent living units are made up of 37 two and three-bedroom cottages, 24 two and three-bedroom villas and 24 two and...
Thomasville Medical Center
Emergency Department
The new 24,000 square-foot Emergency Department at Thomasville Medical Center includes two orthopedic rooms, 6-bed fast tract center, 5-bed chest pain center, behavioral health room, and a sexual assault nurse examiner (SANE)...
Thompson Child & Family Focus
Child Development Center
Rodgers constructed a new Child Development Center for Thompson Child & Family Focus, an organization that began as an orphanage in 1886. The single-story, wood and steel frame building with brick trim has skylights and three...
Time Warner Cable
Corporate Shared Services Campus
Project scope included preconstruction and construction of the new corporate shared services campus for Time Warner Cable in Charlotte, North Carolina. Phase I consisted of a new stand-alone office building and parking...
Trinity Episcopal School
Elementary and Middle School
Project scope includes the construction of a phased primary school consisting of classrooms and support spaces for grades K-8, administrative areas, library, cafeteria, gymnasium and chapel. The school will have a maximum...
U.S. National Whitewater Center
Outdoor Recreational Center
U.S. National Whitewater Center (USNWC) is a unique outdoor recreational center and whitewater park located within a 300+/- acre property in Mecklenburg County. The main attraction is the man-made, recirculating, multi-channel,...
UNC Charlotte
Student Activities Center
Rodgers was selected as the replacement contractor to complete construction of the $26.5 million James H. Barnhardt Student Activity Center, which included the 9,000-seat Dale F. Halton Arena. The 225,000-square-foot student...
United Methodist Retirement Community
Givens Estates Expansion and Renovation Program
All sitework includes clearing, roadways, parking, utilities, lakes and landscaping for approximately 22 acres in the mountains of Asheville, North Carolina. Project scope includes a new 6-story, concrete framed independent...
University of North Carolina at Chapel Hill
Information Technology Services Building
The project scope includes the construction of a stand-alone, 5-level, steel-frame Information Technology Services (ITS) Facility to serve all the technology infrastructure and application needs for the entire UNC at Chapel Hill...
University of North Carolina at Greensboro
Aycock Auditorium Renovation
The project scope included a comprehensive renovation and modernization of the entire auditorium that was built in 1927. The 2,200-seat facility has new seating, better sight lines, new orchestra pit, renovation to back of house...
Wachovia, a Wells Fargo Company
One Wachovia Tower - Wachovia Securities PCG
In January 2007, Rodgers began a 6,500 square-foot renovation at One Wachovia Tower to create a new home for Wachovia Securities PCG. The new brokerage offices have glass fronts and there is an exterior stock ticker that wraps...
Wells Fargo & Company
Office Upfit
The Rodgers team was responsible for the 211,650-square-foot upfit of seven floors within the Duke Energy Center office tower, located in Center City Charlotte; this included general office space and conference areas. Interior...