Construction Cost > $5,000,000 or greater

715 North Church
Residential and Retail

Located in the Fourth Ward of downtown Charlotte, residents at 715 North Church enjoy the benefits of a one-of-a-kind urban community. This development combines space for well-integrated residential (77,000 sf), retail (12,346...

View Project

Alamance Regional Medical Center
Replacement Hospital

In November 1991, Rodgers was awarded a managing contractor agreement to assist in the development of a new $51.5 million replacement hospital on an 80-acre campus, consolidating the old Alamance County Hospital and Memorial...

View Project

Allstate Atlantic Data Center
Expansion and Renovation Program

In 1993, Rodgers entered into a negotiated contract with Allstate Insurance Company to renovate the entire Allstate Atlantic Data Center near University Research Park in Charlotte. In three years, Rodgers completed over 190,000...

View Project

Ballantyne Village
Retail and Office

Phase I project scope includes the construction of three new structures that integrate retail, parking, and offices spaces. The mixed-use development is situated on the last remaining undeveloped corner of Ballantyne Square in...

View Project

Bank of America
7th Street Station Parking Deck

In April 1997, Rodgers was selected by Bank of America to provide construction services for a 10-level, 543,000 square foot cast-in-place, concrete parking deck on one block between Sixth and Seventh Street in highly-trafficked...

View Project

Bank of America/Cousins Properties
Gateway Village

The Gateway Village project is located on 15 acres in the heart of downtown Charlotte. Total project build-out includes 1.1 million square feet of office space, 2,750 parking spaces, and over 500 residential units/street level...

View Project

Bechtler Museum of Modern Art
Levine Center for the Arts

Located in the new Cultural Arts District of downtown Charlotte, The Bechtler Museum will house the Andreas Bechtler family’s private collection of modern art - including several important artists, such as Tinguely, Niki de Saint...

View Project

Belk Stores
Belk – SouthPark Mall

In April 2001, Rodgers was awarded a preconstruction and general construction contract to expand and renovate Belk Stores retail department store at SouthPark Mall in Charlotte, North Carolina. The 18-month project transformed...

View Project

Belk Stores
Belk – Carolina Place Mall

Located in Pineville, North Carolina, the Belk at Carolina Place Mall represents the fourth Belk store project that Rodgers has completed since the mid-1980s. Other Belk store projects include Eastland Mall, Charlotte, North...

View Project

Belle Meade Retirement Resort
Continuing Care Retirement Community

The project scope encompassed all sitework including clearing, road construction, utilities, lakes and landscaping; construction of 48 cottage units, with a mix of single and duplex; three 84,000 square foot, 3-story,...

View Project

Billy Graham Evangelistic Association
The Billy Graham Library and Museum

The project scope includes the preconstruction and construction of a single-story, steel-frame library/museum that is dedicated to the life and teachings of Reverend Billy Graham. The 40,000-square-foot facility, which resembles...

View Project

Bissell
Gragg and Woodward Office Buildings

Rodgers is constructing twin, Class A, 10-story office buildings in Ballantyne Corporate Park, which is located at the corner of Ballantyne Commons Parkway and North Community House Road in Charlotte. Upon completion, which is...

View Project

Central Piedmont Community College
Academic and Performing Arts Center

The Academic and Performing Arts Center is known as the campus' grandest building designed in the Neo-Georgian/Classical style of architecture with its striking Ionic Style limestone collumns that rise 37 feet and weigh...

View Project

Central Piedmont Community College
Philip L. Van Every Culinary Arts Center

Over the course of 14 months, Rodgers worked steadfast to complete Central Piedmont Community College’s (CPCC) new culinary arts building—just before students returned for the 2009 fall semester. The 30,612-square-foot building,...

View Project

Central Piedmont Community College
Health Careers Building

Rodgers was responsible for the 98,000-square-foot expansion and 59,320-square-foot renovation of Central Piedmont Community College’s (CPCC) Health Careers Building as part of the Central Campus Master Expansion Plan. The...

View Project

Charlotte Country Club
Clubhouse Restoration and Addition

Charlotte Country Club hired Rodgers to execute a comprehensive renovation and restoration of their Clubhouse, which dates back to 1931, and to build a new two-level, 9,600-square-foot addition. Every room in the Clubhouse was...

View Project

Charlotte Mecklenburg Schools
Mallard Creek High School

Project scope includes the construction of a new high school consisting of one main building and multiple field buildings situated on 62-acres in northeast Charlotte. Site plans include a courtyard, auditorium, cafeteria,...

View Project

Charlotte Mecklenburg Schools
William A. Hough High School

The new 258,000-square-foot high school is situated on 60 acres of land in Cornelius, North Carolina. The main building is a two-story, steel structure with masonry skin. Inside there are 99 classrooms, which includes 16 science...

View Project

Chatham Hospital
Replacement Hospital

The project scope includes a new 25-bed critical access hospital. This 72,000 square-foot steel-frame hospital replaces the former 55-year-old facility nearby in Siler City. The new hospital includes the following services:...

View Project

Christ Covenant
Sanctuary

The new sanctuary seats 2,200 people and includes a balcony that allows seating for an additional 1,000 people. The 44,000-square-foot facility includes a music ministries choir rehearsal area, adult and preschool classrooms,...

View Project

City of Mauldin
Sports & Recreation Center

The project scope involves the preconstruction and construction of a 30,000 square-foot sports and recreation center for the City of Mauldin. The project delivery method follows the CM-at-Risk approach. The facility includes a...

View Project

Cleveland Regional Medical Center
Emergency Department and Outpatient Center

The project includes a 2-level addition of 48,000 square feet and renovation of 10,000 square feet. The new construction houses a comprehensive emergency department, PACU, pre/post op, lab, support space, physicians' lounge,...

View Project

CMC-Huntersville
Medical Office Building

The five-story, 125,000-square-foot medical office building and Same-Day Surgery Center was built for CMC-NorthCross, which is now CMC-Huntersville. The steel frame, brick veneer building has a single-ply roof system and punched...

View Project

CMC-Kannapolis
Healthcare Pavilion and Emergency Department

Carolinas HealthCare System has added a new healthcare facility in Cabarrus County: CMC-Kannapolis. Over the course of 11 months, Rodgers built the 26,000-square-foot healthcare pavilion and 24-hour emergency department, which...

View Project

CMC-Mint Hill Medical Plaza
Medical Office Building

The project scope includes the preconstruction and construction of a tri-level, steel frame medical office building for Carolinas Medical Center in Mint Hill. The 60,000-square-foot facility is situated on a 17-acre site. ...

View Project

CMC-NorthEast
Clinical Services Building and Children's Hospital

In December 2006, Rodgers completed a 96,000-square-foot vertical expansion to the Clinical Services Building. Two additional floors were added above the original structure that Rodgers built in 1998. Rodgers worked closely with...

View Project

CMC-NorthEast
Clinical Services Building

Rodgers provided comprehensive preconstruction and construction services for the development of a new $32 million, 270,000-square-foot clinical services building at CMC-NorthEast, which opened in November 1998. The facility...

View Project

CMC-NorthEast
Expansion and Renovation Program Phase I

In March 1989, CMC-NorthEast [formerly NorthEast Medical Center] selected Rodgers as the master general contractor for their Phase I Capital Improvement Program. Construction projects included a new Energy Center, Ambulatory...

View Project

CMC-NorthEast
Oncology Pavilion

On April 29, 2007, CMC-NorthEast (formerly NorthEast Medical Center) opened The Pavilion, a cancer treatment facility at the hospital’s Concord campus. The oncology addition is a 145,000-square-foot, steel frame building with...

View Project

CMC-NorthEast
Parking Deck

The project scope includes construction of a 318,000-square-foot, 967-space parking deck. This four-level, precast concrete deck also has a precast panel exterior skin with brick inlay.

View Project

CMC-Pineville
Satellite Hospital

Rodgers provided comprehensive preconstruction and construction services for the development of Carolinas Medical Center's satellite hospital in south Charlotte. Prior to its development in the early 1980s, Charlotte's three...

View Project

CMC-Steele Creek
Healthcare Pavilion

Rodgers completed the 79,345-square-foot Steele Creek Healthcare Pavilion in approximately 14 months. Primary components include a medical office building and a 26,000-square-foot, stand-alone emergency department. The...

View Project

CMC-Union
Diagnostic and Treatment Pavillion

The project scope included construction of a new Diagnostic and Treatment Pavilion for Union Regional Medical Center, which was renamed CMC-Union in 2005. The 73,000-square-foot Pavilion has two floors and an enclosed,...

View Project

CMC-Union
Medical Plaza

The project scope included preconstruction and construction of a three-level, steel-frame medical office building on the campus of CMC-Union. The 60,000-square-foot facility is adjacent and connected to the Diagnostic & Treatment...

View Project

CMC-Union
Emergency Department

Rodgers completed the 23,194-square-foot addition and renovation to the existing Emergency Department (ED) at CMC–Union. Highlights of Phase I included 29 treatment rooms (two trauma rooms), four nurses’ stations, two physicians’...

View Project

Covenant Day School
High School

Project scope for Covenant Day School (High School) includes space for approximately 300 students. Phase I includes a new, two-story, 48,000 square foot structure built adjacent to the existing Christ Covenant Church campus. It...

View Project

Daniel Stowe Botanical Garden
Visitor Pavilion & Phase I Gardens

The project consists of a multi-phased, 450-acre botanical garden in Belmont, North Carolina. Phase I of the five-phased, 20-year project includes the development of approximately 106 acres. Phase I was completed in Fall 1999,...

View Project

Daniel Stowe Botanical Garden
Orchid Conservatory

Phase II of the Daniel Stowe Botanical Garden (DSBG) development consists of a new Orchid Conservatory. This is Rodgers' second project for DSBG and it is part of a five-phase, 20-year development plan to develop the regional...

View Project

Davidson College
Knobloch Campus Center and Duke Family Performance Hall

The project scope includes the renovation of the existing Johnson Gymnasium for the Alvarez College Union, which includes a bookstore, post office, student cafe, aerobic/ exercise areas and a student lounge. Additionally, the...

View Project

Davidson College
Watson Life Sciences Building

The project consists of a new 3-level, 50,000 square foot life sciences building on the campus of Davidson College. The floor plan includes mainly classroom space, research laboratories, office and other support space. The...

View Project

Davidson College
Duke Residence Hall

Project scope consisted of a 23,000 square-foot, 4-story addition to the Duke Dormitory. The new structure is composed of a masonry veneer and hollowcore floor slabs. There was an additional 14,000 square feet of comprehensive...

View Project

Davidson College
Baker Sports Complex

Completed in 1989, the $12.3 million Baker Sports Complex consists of a 142,000-square-foot facility including a 6,100-seat basketball arena, 8-lane (25-meter) natatorium, locker rooms for soccer, basketball, baseball, field...

View Project

Davidson College
Cunningham Fine Arts Building Renovation

Cunningham Fine Arts Building was originally built in 1961. The building’s brick exterior remained intact, but the 24,000-square-foot interior space was renovated and upgraded to accommodate new theatrical equipment and the...

View Project

Davidson College
Chambers Building Comprehensive Renovation

Originally constructed in 1927, the 95,000-square-foot Chambers Building is the most prominent academic building on the Davidson College campus. The project scope focused on a comprehensive renovation of the Chambers Building...

View Project

Davidson College
Davis Residence Hall

Rodgers was responsible for the construction of Davis Residence Hall, the seventh building in Martin Court, an area of campus that is dedicated to student housing. This building has load-bearing masonry walls and precast concrete...

View Project

Deerfield Episcopal Retirement Community
Expansion and Renovation Program

Deerfield Episcopal Retirement Community is located on 125 acres of land in Asheville, North Carolina. As part of a campus expansion, Rodgers Builders constructed three new buildings that included separate additions, tie-ins, and...

View Project

Discovery Place
Science Museum

When Discovery Place was built in downtown Charlotte in 1981, it had 72,000 square feet of space. Additional exhibition space was added in 1986 and the IMAX® Dome Theatre was built in 1991, which brought the total square-footage...

View Project

Elon College
McMichael Science Building

The four-level, 82,000 square-foot McMichael Science Center at Elon University in Elon, North Carolina includes new laboratories, research/ monitoring facilities, classrooms, offices and support spaces for the Biology, Chemistry...

View Project

First Presbyterian Church
Education Addition Phases I & II

In 1999, Rodgers was selected to perform preconstruction and construction services for the new fellowship, education, kitchen, and sanctuary expansion and renovation. This $10 million expansion includes over 75,000 square feet of...

View Project

Forsyth Medical Center
Parking Deck and Central Energy Plant

The North Parking Deck scope includes the construction of a 4-level, cast-in-place concrete parking deck situated directly adjacent to the new North Pavilion Addition. The 558,700 square foot deck accommodates spaces for 1,416...

View Project

Forsyth Medical Center
North Pavilion

The project scope includes three main components on the campus of Forsyth Medical Center. The North Pavilion involves a new 9-level, Women's Center addition adjacent and connected to the existing main hospital complex. The...

View Project

Furman University
Science Building Addition and Renovation

The Furman University project included the complete renovation of an existing science building, Plyler Hall, and the addition of two new buildings linked to Plyler Hall: the South Addition and the North Addition. Renovations...

View Project

Greenville Memorial Hospital
Diagnostic & Treatment Pavilion

This project was an addition to the existing hospital; it consisted of five floors of shell space along with a complete interior upfit and a renovation to the existing lab. The new structure was constructed over the existing...

View Project

Hamilton Medical Center
Emergency Department

The project scope includes an expansion and renovation to Hamilton Medical Center's Emergency Department. The addition involves an underground basement level of 1,000 square feet and a 6,730 square-foot above-ground, steel frame...

View Project

High Associates
One Mallard Pointe

The project scope includes construction of a three-story, 100,000 square-foot Class A office building located in the fast-growing University Research Park area in northeast Charlotte. The exterior skin blends brick and cast stone...

View Project

High Point Regional Hospital
Expansion and Renovation Program

The expansion and renovation program included a $3.6 million, 18,000 square foot second-level vertical expansion to the existing single level Surgery Center, a new $23.2 million, 135,000 square-foot, 5-level Cardiology Pavilion,...

View Project

ImaginOn
The Joe & Joan Martin Center

The $28 million facility was constructed in the central business district of uptown Charlotte. The 168,000-square-foot Children's Learning Center includes two large 550-seat and 250-seat theaters with state-of-the-art technology,...

View Project

Johnson & Wales University
Academic Building

The centerpiece of Johnson & Wales University's Charlotte Campus is the 5-story, 162,000-square-foot Academic Center, which house the culinary arts and business school. The $36.9 million facility includes a superstructure of...

View Project

Johnson & Wales University
Student Center

In spring 2010, Johnson & Wales University broke ground on a new student center at their Charlotte campus. Rodgers provided preconstruction and construction management services for the project, which was completed within 10...

View Project

Knight Theater
Levine Center for the Arts

This 1,150-seat multi-purpose theater is located in a newly developed cultural arts district of downtown Charlotte, North Carolina. This city-owned theater is designed for local art groups such as dance companies, city youth...

View Project

Latta Pavilion
Residential, Retail and Office

Latta Pavilion, located on East Boulevard at Kenilworth Avenue, incorporates street-level shops, office space, restaurants, apartments, and condominiums. The development consists of two buildings totaling over 500,000 square...

View Project

Lowe's Companies
Customer Support Center Phase III Expansion

Rodgers returned to Lowe’s Companies in Mooresville to complete a second major expansion at their corporate headquarters. The Phase III Expansion, which totaled over 1.6 million square feet, includes two 7-level corporate office...

View Project

Maersk
Arrowood Regional Operations Center

The project scope for Maersk, Inc.'s new Arrowpoint Regional Operations Center includes preconstruction services and comprehensive office renovations. The 350,000 square-foot, renovated space will house Maersk's 7,000...

View Project

McColl Center for Visual Art
Gallery and Artists Studios

In Spring 1998, Bank of America selected Rodgers to begin restoration and renovation of the former First Associate Reformed Presbyterian Church located on North Tryon Street in downtown Charlotte. The restored facility houses the...

View Project

Meredith College
Science and Mathematics Building

In August 2001, Rodgers began construction of Meredith College's new multidisciplinary facility for math and science teaching and research. The facility is a lab-rich environment including Biology, Chemistry, and Computer Science...

View Project

Mint Museum Uptown
Levine Center for the Arts

Hired in 2008 to perform preconstruction services, Rodgers ultimately provided interior upfit construction services for the new Mint Museum Uptown. The project scope included exhibition, educational, administrative and support...

View Project

Morrison Place
Residential and Retail

Phase I project scope includes the construction of two 2-level mixed-use buildings (B&E) situated in the prominent South Park area of Charlotte. The two buildings total 92,000 square feet and are steel-frame construction. The...

View Project

Nash General Hospital
Surgery Pavilion

The surgery pavilion consists of a 2-story, 66,000-square-foot addition connected to the existing hospital at five locations. It includes 8 operating rooms, 14 pre-op/post-op rooms, new PACU, sterile supply/decontamination...

View Project

Nash General Hospital
Parking Deck and Central Energy Plant

The parking deck is a 411-space, cast-in-place, post-tension concrete structure. The deck is 158,000 square feet and serves hospital visitors, staff, and physicians. The campus expansion program also included a new...

View Project

New Hanover Regional Medical Center
Women's and Children's Center

The Betty H. Cameron Women’s and Children’s Hospital is the second of six projects to be completed on New Hanover Regional Medical Center campus as part of its Strategic Master Facility Plan Implementation Program. The Rodgers...

View Project

New Hanover Regional Medical Center
Surgery Pavilion

The Surgery Pavilion was the first of six projects to be completed on New Hanover Regional Medical Center campus as part of its Strategic Master Facility Plan Implementation Program. The Rodgers project team broke ground on...

View Project

North Carolina Dance Theatre
Theatre and Dance Studios

North Carolina Dance Theatre’s (NCDT) groundbreaking ceremony was held in April 2009 and Rodgers completed the building approximately one year later. This building has since been named the Patricia McBride and Jean-Pierre...

View Project

Oconee Medical Center
Patient Tower

The new 210,000-square-foot Patient Tower at Oconee Medical Center has six stories, mechanical penthouse, and a basement level. It has been designed to accommodate three additional floors, if needed in the future. Inside the...

View Project

Palmetto Health Baptist
Perioperative Modernization

The $40 million, multi-phase modernization of Palmetto Health Baptist included 30,000 square feet of new construction and 100,000 square feet of renovations. Improvements and upgrades focused heavily on surgical, obstetrical and...

View Project

Palmetto Health Richland
Heart and Vascular Hospital

Project scope includes a $80 million campus expansion and upgrade to the Palmetto Health Richland hospital campus. Project components include a 4-story, cast-inplace, post-tension concrete parking deck. The $10.4 million deck is...

View Project

Palmetto Health Richland
Children's Hospital

Project scope includes two additions and a major renovation for Palmetto Health's new Children's Hospital. The project marks the fourth substantial project that Rodgers and Palmetto have partnered on since 2001. The two additions...

View Project

Pennybyrn at Maryfield
Continuing Care Retirement Community

This project is an expansion of the existing Maryfield Retirement Community overlooking High Point City Lake. New construction consists of a three-story building with a Community Commons and Wellness Center, two contiguous wings...

View Project

Presbyterian Hospital
Women's Services Center

The Women's Center expansion and renovation program included a 66,000-square-foot vertical expansion atop an existing 8-story precast parking deck, a 20,000-square-foot North Wing addition above the existing 2-story Children's...

View Project

Presbyterian Hospital
Visitor Parking Deck B

The project scope included a new 7-level, 500,000 square foot pre-cast parking deck on the Presbyterian Hospital campus in Charlotte, North Carolina. The 1,500-space parking deck was designed and constructed to accommodate future...

View Project

Presbyterian Hospital
Medical Office Building

Rodgers provided comprehensive preconstruction and construction services for development of the new $17 million, 163,500 square-foot medical office tower at Presbyterian Hospital's uptown Charlotte campus. In addition to the...

View Project

Primax Properties
1065 East Morehead - Corporate Offices

The project scope involved the preconstruction and construction of a 4-level office building and parking deck on Morehead Street in Charlotte, North Carolina. The steel-frame office building is approximately 39,000 square feet...

View Project

Queens University of Charlotte
Wireman Residence Hall

The project consists of a five-story, 90,000 square-foot dormitory. The structure is cast-in-place, post-tension concrete with brick veneer, cast stone water table and GFRC cornices and entablatures. The facility includes a...

View Project

Queens University of Charlotte
Sykes Business Learning Center

Project scope consisted of a four-story, 29,000 square-foot addition to the University campus. The Learning Center is composed of a cast-in-place concrete frame basement with a three-level steel frame above. Included within the...

View Project

River Landing at Sandy Ridge
Continuing Care Retirement Community

The project scope consisted of a Community Center, a 76,000-square-foot Healthcare Center with an Alzheimer’s wing, a 285,000-square-foot Apartment Building, and Independent Living Units that include two- and three-bedroom...

View Project

Self Regional Healthcare
Cancer Center Addition and Renovations

This project consisted of renovations (38,000 SF) and additions (9,800 SF) to convert and create space for Self Regional’s Cancer Center. The main lobby (4,200 SF) was also renovated during the same time period. Building...

View Project

Sharon Towers
Independent Living Tower, Parking Deck, and Renovations

The Independent Living Tower, also known as South Terrace Apartments, is a 10-story building with 49 spacious apartments that include balconies. This 96,660-square-foot, steel-framed tower is contiguous to the community center...

View Project

Southminster Retirement Community
Expansion and Renovation Program

Rodgers was selected to provide comprehensive preconstruction and construction services for the $66 million expansion and renovation program at Southminster Retirement Community. The project scope included 283,000 square feet...

View Project

State of North Carolina
Western Data Center

The project scope includes 50,000 sq. ft. new data center that protects all State of North Carolina government data in the event of a natural disaster or threat to homeland security. The data center contains over 15,000 sq. ft....

View Project

The Forest at Duke
Continuing Care Retirement Community

In July 1990, Rodgers broke ground on the 50-acre site for the Forest at Duke, a full-service, continuing care retirement community in Durham, North Carolina. Rodgers negotiated with the Forest at Duke to provide comprehensive...

View Project

The Medical Center of Central Georgia
Heart and Vascular Hospital & Parking Deck

The project scope involved the construction of a 221,300-square-foot comprehensive Heart Hospital directly adjacent to the existing hospital. The steel-frame building has eight levels and connects to the existing hospital on five...

View Project

The Mint Museum
Mint Museum of Craft + Design

In February 1998, Rodgers began renovation and restoration of the former Montaldo's department store building located in downtown Charlotte. The 82,000 square-foot historic structure now houses the Mint Museum of Craft + Design....

View Project

The Pines at Davidson
Continuing Care Retirement Community

Built in three phases, Phase I included 171 units, 2- and 3-story buildings, 10 duplex cottages, 60-bed Healthcare Center (40 nursing beds, 20 skilled care beds), and a Community Center. Phase II consisted of a Healthcare Center...

View Project

Thomasville Medical Center
Emergency Department

The new 24,000 square-foot Emergency Department at Thomasville Medical Center includes two orthopedic rooms, 6-bed fast tract center, 5-bed chest pain center, behavioral health room, and a sexual assault nurse examiner (SANE)...

View Project

Thompson Child & Family Focus
Child Development Center

Rodgers constructed a new Child Development Center for Thompson Child & Family Focus, an organization that began as an orphanage in 1886. The single-story, wood and steel frame building with brick trim has skylights and three...

View Project

Time Warner Cable
Corporate Shared Services Campus

Project scope included preconstruction and construction of the new corporate shared services campus for Time Warner Cable in Charlotte, North Carolina. Phase I consisted of a new stand-alone office building and parking...

View Project

Trinity Episcopal School
Elementary and Middle School

Project scope includes the construction of a phased primary school consisting of classrooms and support spaces for grades K-8, administrative areas, library, cafeteria, gymnasium and chapel. The school will have a maximum...

View Project

U.S. National Whitewater Center
Outdoor Recreational Center

U.S. National Whitewater Center (USNWC) is a unique outdoor recreational center and whitewater park located within a 300+/- acre property in Mecklenburg County. The main attraction is the man-made, recirculating, multi-channel,...

View Project

UNC Charlotte
Bioinformatics Center

The Bioinformatics Center marks the second CM-at-Risk contract awarded to Rodgers on the UNC Charlotte campus. It is the third building located on the Charlotte Research Institute Campus at UNC Charlotte. The 100,000-square-foot...

View Project

UNC Charlotte
Phase 8 Residence Hall

The Residence Hall Phase 8 at UNC Charlotte is a 4-story, steel-frame structure housing 502 new beds for students. The 148,307 square-foot facility consists of 87 single and 38 double suites. The exterior skin includes exterior...

View Project

UNC Charlotte
James H. Barnhardt Student Activity Center

Rodgers was selected as the replacement contractor to complete construction of the $26.5 million James H. Barnhardt Student Activity Center, which included the 9,000-seat Dale F. Halton Arena. The 225,000-square-foot student...

View Project

UNC Charlotte
Center City Building

Located at the corner of Ninth and Brevard Streets, the distinctive Center City Building is guaranteed to capture the viewer’s attention. The contemporary glass building, with fritted and spandrel panels, rises three stories then...

View Project

United Methodist Retirement Community
Givens Estates Expansion and Renovation Program

All sitework includes clearing, roadways, parking, utilities, lakes and landscaping for approximately 22 acres in the mountains of Asheville, North Carolina. Project scope includes a new 6-story, concrete framed independent...

View Project

University of North Carolina at Chapel Hill
Information Technology Services Building

The project scope includes the construction of a stand-alone, 5-level, steel-frame Information Technology Services (ITS) Facility to serve all the technology infrastructure and application needs for the entire UNC at Chapel Hill...

View Project

University of North Carolina at Greensboro
School of Education

Rodgers was part of the team responsible for creating the University of North Carolina at Greensboro’s (UNCG) first LEED® certified building, which achieved LEED Gold. The 110,500-square-foot, five-story classroom building is a...

View Project

University of North Carolina at Greensboro
Aycock Auditorium Renovation

The project scope included a comprehensive renovation and modernization of the entire auditorium that was built in 1927. The 2,200-seat facility has new seating, better sight lines, new orchestra pit, renovation to back of house...

View Project

University of North Carolina at Wilmington
Academic and Cultural Arts Building

In 2002, Rodgers was awarded a construction management-at-risk contract with the state of North Carolina and UNC Wilmington to provide preconstruction and construction management services for the university's new cultural arts...

View Project

Wells Fargo
Office Upfit

The Rodgers team was responsible for the 211,650-square-foot upfit of seven floors within the Duke Energy Center office tower, located in Center City Charlotte; this included general office space and conference areas. Interior...

View Project

WellStar Health System
Kennestone Hospital - Patient Tower

This construction project is a 163,000 square-foot, 8-story bed tower with connector bridges to the existing hospital at four levels. The new tower includes 12 cardiovascular patient beds, 24 ARU beds with future OR suites, a...

View Project