Construction Cost > $2,100,000 or greater
Alamance Regional Medical Center
Replacement Hospital
In November 1991, Rodgers was awarded a managing contractor agreement to assist in the development of a new $51.5 million replacement hospital on an 80-acre campus, consolidating the old Alamance County Hospital and Memorial...
Ballantyne Village
Retail and Office
Phase I project scope includes the construction of three new structures that integrate retail, parking, and offices spaces. The mixed-use development is situated on the last remaining undeveloped corner of Ballantyne Square in...
Belle Meade Retirement Resort
Continuing Care Retirement Community
The project scope encompassed all sitework including clearing, road construction, utilities, lakes and landscaping; construction of 48 cottage units, with a mix of single and duplex; three 84,000 square foot, 3-story,...
Carolinas Medical Center – NorthEast
Building Expansion & Children's Hospital
The project scope includes a 2-level vertical expansion over the existing clinical services building constructed by Rodgers in 1997/1998. The 96,000 square footage, steel frame addition includes a new ICU/Patient Care bed unit...
Carolinas Medical Center – NorthEast
Clinical Services Building
Rodgers provided comprehensive preconstruction and construction services for the development of a 270,000-square-foot clinical services building at this growing medical center. The project included an emergency department, new...
Carolinas Medical Center – NorthEast
Expansion and Renovation Program Phase I
In March 1989, NorthEast Medical Center selected Rodgers Builders as the master general contractor for their Phase I "Capital Improvement Program." The $31 million first phase construction included: Energy Center, Site...
Carolinas Medical Center – NorthEast
Oncology Addition
The Oncology Pavilion scope includes a new 5-level (including cast-in-place concrete basement) addition to the hospital's Concord, North Carolina campus. The project scope consists of a 145,000 square-foot, steel-frame addition...
Carolinas Medical Center – Union
Diagnostic and Treatment Pavillion
The scope of this project includes a new Diagnostic & Treatment Pavilion with an enclosed, two-level, 6,537 squarefoot connector to the existing hospital. The Pavilion consists of approximately 73,000 square feet on two floors....
Cassidy Turley
Office Upfit
Rodgers completed Cassidy Turley’s new office, located on the 34th floor of the Duke Energy Center building, within two months. The first generation upfit included a new reception area, conference rooms, café, server room,...
Central Church of God
Children's Church
Project scope included the construction of a new, stand-alone Children's Church facility on the existing campus of the Central Church of God. The 1.5- level, steel-frame structure contains approximately 22,000 square feet of...
Central Piedmont Community College
Academic and Performing Arts Center
The Academic and Performing Arts Center is known as the campus' grandest building designed in the Neo-Georgian/Classical style of architecture with its striking Ionic Style limestone collumns that rise 37 feet and weigh...
Central Piedmont Community College
Health Careers Building
Rodgers was responsible for the 98,000-square-foot expansion and 59,320-square-foot renovation of Central Piedmont Community College’s (CPCC) Health Careers Building as part of the Central Campus Master Expansion Plan. The...
Charlotte Mecklenburg Schools
Mallard Creek High School
Project scope includes the construction of a new high school consisting of one main building and multiple field buildings situated on 62-acres in northeast Charlotte. Site plans include a courtyard, auditorium, cafeteria,...
Charlotte Mecklenburg Schools
William A. Hough High School
The new 258,000-square-foot high school is situated on 60 acres of land in Cornelius, North Carolina. The main building is a two-story, steel structure with masonry skin. Inside there are 99 classrooms, which includes 16 science...
Christ Covenant
Sanctuary
The new sanctuary seats 2,200 people and includes a balcony that allows seating for an additional 1,000 people. The 44,000-square-foot facility includes a music ministries choir rehearsal area, adult and preschool classrooms,...
City of Mauldin
Sports & Recreation Center
The project scope involves the preconstruction and construction of a 30,000 square-foot sports and recreation center for the City of Mauldin. The project delivery method follows the CM-at-Risk approach. The facility includes a...
Covenant Day School
High School
Project scope for Covenant Day School (High School) includes space for approximately 300 students. Phase I includes a new, two-story, 48,000 square foot structure built adjacent to the existing Christ Covenant Church campus. It...
Daniel Stowe Botanical Garden
Orchid Conservatory
Phase II of the Daniel Stowe Botanical Garden (DSBG) development consists of a new Orchid Conservatory. This is Rodgers' second project for DSBG and it is part of a five-phase, 20-year development plan to develop the regional...
Davidson College
Knobloch Campus Center and Duke Family Performance Hall
The project scope includes the renovation of the existing Johnson Gymnasium for the Alvarez College Union, which includes a bookstore, post office, student cafe, aerobic/ exercise areas and a student lounge. Additionally, the...
Davidson College
Watson Life Sciences Building
The project consists of a new 3-level, 50,000 square foot life sciences building on the campus of Davidson College. The floor plan includes mainly classroom space, research laboratories, office and other support space. The...
Davidson College
Duke Residence Hall
Project scope consisted of a 23,000 square-foot, 4-story addition to the Duke Dormitory. The new structure is composed of a masonry veneer and hollowcore floor slabs. There was an additional 14,000 square feet of comprehensive...
Davidson College
Cunningham Fine Arts Building Renovation
Cunningham Fine Arts Building was originally built in 1961. The building’s brick exterior remained intact, but the 24,000-square-foot interior space was renovated and upgraded to accommodate new theatrical equipment and the...
Davidson College
Davis Residence Hall
Beginning in 2011, a new residence hall became available to Davidson College students. Rodgers was responsible for the construction of Davis Residence Hall, the seventh building in Martin Court, an area of campus that is...
Deerfield Episcopal Retirement Community
Expansion and Renovation Program
Deerfield Episcopal Retirement Community is located on 125 acres of land in Asheville, North Carolina. As part of a campus expansion, Rodgers Builders constructed three new buildings that included separate additions, tie-ins, and...
Forsyth Medical Center
Parking Deck & Central Energy Plant
The North Parking Deck scope includes the construction of a 4-level, cast-in-place concrete parking deck situated directly adjacent to the new North Pavilion Addition. The 558,700 square foot deck accommodates spaces for 1,416...
Furman University
Science Building Addition and Renovation
The Furman University project included the complete renovation of an existing science building, Plyler Hall, and the addition of two new buildings linked to Plyler Hall: the South Addition and the North Addition. Renovations...
Greenville Memorial Hospital
Diagnostic & Treatment Pavilion
This project was an addition to the existing hospital; it consisted of five floors of shell space along with a complete interior upfit and a renovation to the existing lab. The new structure was constructed over the existing...
Greenwood School District 50
Oakland Elementary School
Over the course of 14 months, the Oakland Elementary School addition and renovation project was divided into phases to ease the transition while classes remained in session throughout construction. The 15,000-square-foot...
Hamilton Medical Center
Emergency Department
The project scope includes an expansion and renovation to Hamilton Medical Center's Emergency Department. The addition involves an underground basement level of 1,000 square feet and a 6,730 square-foot above-ground, steel frame...
High Associates
One Mallard Pointe
The project scope includes construction of a three-story, 100,000 square-foot Class A office building located in the fast-growing University Research Park area in northeast Charlotte. The exterior skin blends brick and cast stone...
High Point Regional Hospital
Expansion and Renovation Program
The expansion and renovation program included a $3.6 million, 18,000 square foot second-level vertical expansion to the existing single level Surgery Center, a new $23.2 million, 135,000 square-foot, 5-level Cardiology Pavilion,...
ImaginOn
The Joe & Joan Martin Center
The $28 million facility was constructed in the central business district of uptown Charlotte. The 168,000-square-foot Children's Learning Center includes two large 550-seat and 250-seat theaters with state-of-the-art technology,...
Johnson & Wales University
Academic Building
The centerpiece of Johnson & Wales University's Charlotte Campus is the 5-story, 162,000-square-foot Academic Center, which house the culinary arts and business school. The $36.9 million facility includes a superstructure of...
Knight Theater
Levine Center for the Arts
This 1,150-seat multi-purpose theater is located in a newly developed cultural arts district of downtown Charlotte, North Carolina. This city-owned theater is designed for local art groups such as dance companies, city youth...
Latta Pavilion
Residential, Retail and Office
Latta Pavilion, located on East Boulevard at Kenilworth Avenue, incorporates street-level shops, office space, restaurants, apartments, and condominiums. The development consists of two buildings totaling over 500,000 square...
Lowe's Companies
Customer Support Center Phase III Expansion
The project scope involves the second major expansion to the Lowe’s Companies Corporate Headquarters in Mooresville, North Carolina. Major components of the 1.6+ million square foot Phase III expansion consist of two, 7-level...
Maersk
Arrowood Regional Operations Center
The project scope for Maersk, Inc.'s new Arrowpoint Regional Operations Center includes preconstruction services and comprehensive office renovations. The 350,000 square-foot, renovated space will house Maersk's 7,000...
McColl Center for Visual Art
Gallery & Artists Studios
In Spring 1998, Bank of America selected Rodgers to begin restoration and renovation of the former First Associate Reformed Presbyterian Church located on North Tryon Street in downtown Charlotte. The restored facility houses the...
Mint Museum Uptown
Levine Center for the Arts
The new facility for The Mint Museums will encompass approximately 145,000 square feet and will host major traveling exhibitions including some that existing Mint Museum facilities in Charlotte do not support. Upon completion,...
Montreat College
McGowan Center for Christian Studies
The project consists of a 212-seat sanctuary and support space for Christian studies and faculty offices. Located in the heart of the campus, the 8,000 square foot structure has an 85-foot steeple, a visible landmark from most...
Morrison Place
Residential and Retail
Phase I project scope includes the construction of two 2-level mixed-use buildings (B&E) situated in the prominent South Park area of Charlotte. The two buildings total 92,000 square feet and are steel-frame construction. The...
New Hanover Regional Medical Center
Women's & Children's Center
The Betty H. Cameron Women’s and Children’s Hospital is the second of six projects to be completed on New Hanover Regional Medical Center campus as part of its Strategic Master Facility Plan Implementation Program. The Rodgers...
New Hanover Regional Medical Center
Surgery Pavilion
The Surgery Pavilion was the first of six projects to be completed on New Hanover Regional Medical Center campus as part of its Strategic Master Facility Plan Implementation Program. The Rodgers project team broke ground on...
North Carolina Dance Theatre
Theatre & Dance Studios
North Carolina Dance Theatre’s (NCDT) groundbreaking ceremony was held in April 2009 and Rodgers completed the building approximately one year later. This building has since been named the Patricia McBride and Jean-Pierre...
Oconee Medical Center
Patient Tower
The new 210,000-square-foot Patient Tower at Oconee Medical Center has six stories, mechanical penthouse, and a basement level. It has been designed to accommodate three additional floors, if needed in the future. Inside the...
Palmetto Health Baptist
Perioperative Modernization
The $40 million, multi-phase modernization of Palmetto Health Baptist included 30,000 square feet of new construction and 100,000 square feet of renovations. Improvements and upgrades focused heavily on surgical, obstetrical and...
Palmetto Health Richland
Heart & Vascular Hospital
Project scope includes a $80 million campus expansion and upgrade to the Palmetto Health Richland hospital campus. Project components include a 4-story, cast-inplace, post-tension concrete parking deck. The $10.4 million deck is...
Palmetto Health Richland
Children's Hospital
Project scope includes two additions and a major renovation for Palmetto Health's new Children's Hospital. The project marks the fourth substantial project that Rodgers and Palmetto have partnered on since 2001. The two additions...
Pennybyrn at Maryfield
Continuing Care Retirement Community
This project is an expansion of the existing Maryfield Retirement Community overlooking High Point City Lake. New construction consists of a three-story building with a Community Commons and Wellness Center, two contiguous wings...
Presbyterian Hospital
Women's Services Center
The Women's Center expansion and renovation program included a 66,000-square-foot vertical expansion atop an existing 8-story precast parking deck, a 20,000-square-foot North Wing addition above the existing 2-story Children's...
Primax Properties
1065 East Morehead - Corporate Offices
The project scope involved the preconstruction and construction of a 4-level office building and parking deck on Morehead Street in Charlotte, North Carolina. The steel-frame office building is approximately 39,000 square feet...
Queens University of Charlotte
Sykes Business Learning Center
Project scope consisted of a four-story, 29,000 square-foot addition to the University campus. The Learning Center is composed of a cast-in-place concrete frame basement with a three-level steel frame above. Included within the...
Roper Hospital
CyberKnife Addition & Linear Accelerator
This unique project marked the first CyberKnife in the State of South Carolina. Roper Hospital’s CyberKnife addition included renovating the existing x-ray department (1,600 square feet) to accommodate the CyberKnife unit and...
Southminster Retirement Community
Expansion and Renovation Program
Rodgers was selected to provide comprehensive preconstruction and construction services for the $66 million expansion and renovation program at Southminster Retirement Community. The project scope included 283,000 square feet...
The Bissell Companies
Gragg and Woodward Office Buildings
Rodgers is constructing twin, Class A, 10-story office buildings in Ballantyne Corporate Park, which is located at the corner of Ballantyne Commons Parkway and North Community House Road in Charlotte. Upon completion, which is...
The Forest at Duke
Continuing Care Retirement Community
In July 1990, Rodgers broke ground on the 50-acre site for the Forest at Duke, a full-service, continuing care retirement community in Durham, North Carolina. Rodgers negotiated with the Forest at Duke to provide comprehensive...
The Medical Center of Central Georgia
Heart and Vascular Hospital & Parking Deck
The project scope involved the construction of a 221,300-square-foot comprehensive Heart Hospital directly adjacent to the existing hospital. The steel-frame building has eight levels and connects to the existing hospital on five...
The Mint Museums
Mint Museum of Craft + Design
In February 1998, Rodgers began renovation and restoration of the former Montaldo's department store building located in downtown Charlotte. The 82,000 square-foot historic structure now houses the Mint Museum of Craft + Design....
The Presbyterian Homes at High Point
River Landing at Sandy Ridge
Sitework for the 60-acre community includes clearing, road construction, utilities, lakes and landscaping. Independent living units are made up of 37 two and three-bedroom cottages, 24 two and three-bedroom villas and 24 two and...
Thomasville Medical Center
Emergency Department
The new 24,000 square-foot Emergency Department at Thomasville Medical Center includes two orthopedic rooms, 6-bed fast tract center, 5-bed chest pain center, behavioral health room, and a sexual assault nurse examiner (SANE)...
Thompson Child & Family Focus
Child Development Center
Rodgers constructed a new Child Development Center for Thompson Child & Family Focus, an organization that began as an orphanage in 1886. The single-story, wood and steel frame building with brick trim has skylights and three...
Time Warner Cable
Corporate Shared Services Campus
Project scope included preconstruction and construction of the new corporate shared services campus for Time Warner Cable in Charlotte, North Carolina. Phase I consisted of a new stand-alone office building and parking...
U.S. National Whitewater Center
Outdoor Recreational Center
U.S. National Whitewater Center (USNWC) is a unique outdoor recreational center and whitewater park located within a 300+/- acre property in Mecklenburg County. The main attraction is the man-made, recirculating, multi-channel,...
UNC Charlotte
Bioinformatics Center
The Bioinformatics Center marks the second CM-at-Risk contract awarded to Rodgers on the UNC Charlotte campus. It is the third building located on the Charlotte Research Institute Campus at UNC Charlotte. The 100,000-square-foot...
UNC Charlotte
Student Activities Center
Rodgers was selected as the replacement contractor to complete construction of the $26.5 million James H. Barnhardt Student Activity Center, which included the 9,000-seat Dale F. Halton Arena. The 225,000-square-foot student...
UNC Charlotte
Track & Field Center
The Belk Track and Field Center includes a 4,000-permanent-seat stadium complex with expansion capabilities for up to 20,000 spectators; three buildings that encompass 10,500 square feet of heated space, including the North...
UNC Charlotte
Center City Building
Located at the corner of Ninth and Brevard Streets, the distinctive Center City Building is guaranteed to capture the viewer’s attention. The contemporary glass building, with fritted and spandrel panels, rises three stories then...
United Methodist Retirement Community
Givens Estates Expansion and Renovation Program
All sitework includes clearing, roadways, parking, utilities, lakes and landscaping for approximately 22 acres in the mountains of Asheville, North Carolina. Project scope includes a new 6-story, concrete framed independent...
University of North Carolina at Chapel Hill
Information Technology Services Building
The project scope includes the construction of a stand-alone, 5-level, steel-frame Information Technology Services (ITS) Facility to serve all the technology infrastructure and application needs for the entire UNC at Chapel Hill...
University of North Carolina at Wilmington
Academic and Cultural Arts Building
In 2002, Rodgers was awarded a construction management-at-risk contract with the state of North Carolina and UNC Wilmington to provide preconstruction and construction management services for the university's new cultural arts...
Wachovia, a Wells Fargo Company
One Wachovia Tower - Wachovia Securities PCG
In January 2007, Rodgers began a 6,500 square-foot renovation at One Wachovia Tower to create a new home for Wachovia Securities PCG. The new brokerage offices have glass fronts and there is an exterior stock ticker that wraps...
WellStar Health System
Kennestone Hospital - Patient Tower
This construction project is a 163,000 square-foot, 8-story bed tower with connector bridges to the existing hospital at four levels. The new tower includes 12 cardiovascular patient beds, 24 ARU beds with future OR suites, a...